Search

found 435 results

Images, Alexander Turnbull Library

Shows a carcass that represents the Christchurch Cathedral with many people rushing to try to save it from demolition. Context: the extremely controversial debate about whether the Christchurch Cathedral which was severely damaged in the earthquakes, should be demolished, rebuilt on the same site in the same style or partially demolished and made into a memorial. Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

A photograph of the partially-demolished Hagley Hostel on Riccarton Avenue. A crane and an excavator are parked in front of the building. Wire fences and shipping containers have been placed around the outside as a cordon.

Videos, UC QuakeStudies

A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.

Videos, UC QuakeStudies

A video of people protesting the demolition of the Cranmer Courts on Armagh Street. In the background, an excavator is being used to demolish the building. Earlier in the day a man was arrested on a trespassing charge for climbing the fence.

Images, UC QuakeStudies

A CERA information sign on the fence in the Cathedral Square, placed to provide information to the public about the buildings seen from Cathedral Square. This one says "Clarendon Tower: This will be demolished. Currently CERA is working towards the appointment of an accredited demolistion contractor".

Images, eqnz.chch.2010

20161112_9961_7D2-70 The future face of Christchurch? Cultivate Christchurch is operating this urban farm in the city, about 5-10 minutes walk to Cathedral Square. Many of the buildings in this area were demolished after the earhquakes, and in the background is a new building on Kilmore Street.

Videos, UC QuakeStudies

A video of a tour of the Christchurch central city Red Zone. The video includes footage of Oxford Terrace, Armagh Street, Colombo Street, Gloucester Street, Hereford Street, High Street, the Westpac Trust Building, Cashel Street, Manchester Street, Poplar Lane, the site of the demolished Convention Centre, and the Crowne Plaza Hotel.

Images, UC QuakeStudies

A digger in front of a partially-demolished building in Cathedral Square. In the background the Farmers and MFL buildings are visible. The photographer comments, "This was taken on the CERA CBD red zone tour. Being on the left hand side of the coach for 75% of the journey I was facing the red zone fence looking at the outside of the red zone".

Images, UC QuakeStudies

Broken windows on the Orion building on Manchester Street. The photographer comments, "Bob Brown's Hi-Fi was damaged, as you can see, in the Christchurch earthquake on the 22 February 2011. At lot of buildings in the area have been demolished, but this art deco style structure might have not have been put on the demolition list yet".

Research Papers, Lincoln University

Purpose - The purpose of this paper is to identify through the application of Actor Network Theory (ANT) the issues and impediments to the implementation of mandatory seismic retrofitting policies proposed by the New Zealand Government. In particular the tension between the heritage protection objectives contained in the Resource Management Act 1991 and the earthquake mitigation measures contained in the Building Act 2004 are examined. Design/methodology/approach - The paper uses a case study approach based on the Harcourts Building in Wellington New Zealand and the case law relating to attempts to demolish this particular building. Use is made of ANT as a 'lens' to identify and study the controversies around mandatory seismic retrofitting of heritage buildings. The concept of translation is used to draw network diagrams.

Research papers, University of Canterbury Library

Designing a structure for higher- than-code seismic performance can result in significant economic and environmental benefits. This higher performance can be achieved using the principles of Performance-Based Design, in which engineers design structures to minimize the probabilistic lifecycle seismic impacts on a building. Although the concept of Performance-Based Design is not particularly new, the initial capital costs associated with designing structures for higher performance have historically hindered the widespread adoption of performance-based design practices. To overcome this roadblock, this research is focused on providing policy makers and stakeholders with evidence-based environmental incentives for designing structures in New Zealand for higher seismic performance. In the first phase of the research, the environmental impacts of demolitions in Christchurch following the Canterbury Earthquakes were quantified to demonstrate the environmental consequences of demolitions following seismic events. That is the focus here. A building data set consisting of 142 concrete buildings that were demolished following the earthquake was used to quantify the environmental impacts of the demolitions in terms of the embodied carbon and energy in the building materials. A reduced set of buildings was used to develop a material takeoff model to estimate material quantities in the entire building set, and a lifecycle assessment tool was used to calculate the embodied carbon and energy in the materials. The results revealed staggering impacts in terms of the embodied carbon and energy in the materials in the demolished buildings. Ongoing work is focused developing an environmental impact framework that incorporates all the complex factors (e.g. construction methodologies, repair methodologies (if applicable), demolition methodologies (if applicable), and waste management) that contribute to the environmental impacts of building repair and demolition following earthquakes.

Audio, Radio New Zealand

Cantabrians are still surrounded broken buildings and empty spaces on the 10th anniversary of the devastating 22 February 2011 Christchurch earthquake. The disaster forced 70 percent of the CBD to be demolished. The Government launched an ambitious recovery plan to help it recover in 2012. The Christchurch Central Recovery Plan, dubbed the "blueprint" would dictate the rebuild of the central city. To support it, the Government would complete a series of "anchor projects", to encourage investment in the city and make it a more attractive place to live in. As Anan Zaki reports, the anchor projects appeared to weigh down the progress of the rebuild.

Research Papers, Lincoln University

As a result of the findings and recommendations of the Royal Commission of Inquiry into the Canterbury Earthquake Swarm of 2010-2011 the New Zealand Government has introduced new legislation that will require the mandatory strengthening of all earthquake-prone buildings in New Zealand. An earthquake prone building is currently defined as a building that is less than one third the seismic strength of a new building. If an owner does not wish to strengthen their buildings then they must demolish them. Seismic retrofitting of buildings is a form of property development and as such, the decision to retrofit or not should be based on a robust and soundly conducted feasibility study. Feasibility studies on seismic retrofitting can be particularly challenging for a number of reasons thus making it difficult for owners to make informed and sound decisions relating to their earthquake prone buildings. This paper considers the concept and process of feasibility analysis as applied to earthquake prone buildings and discusses the current challenges posed by such feasibility studies. A number of recommendations are made in an attempt to help develop a best practice model for decision making relating to earthquake prone buildings."

Videos, UC QuakeStudies

A video of an interview with Earthquake Recovery Minister Gerry Brownlee and Frank Delli Cicchi, the Grand Central Group Australian and New Zealand general manager, about the demolition of the Hotel Grand Chancellor. The Grand Chancellor is the tallest building in Christchurch, and was severely damaged during the 22 February 2011 earthquake. Fletcher Construction have been chosen to demolish the building.

Images, UC QuakeStudies

A photograph of the site of a demolished building on the corner of Bealey Avenue and Victoria Street. Wire fencing has been placed around the site as a cordon. Signs on the fence indicate that many of the businesses which were in the area have moved and are still open.

Images, UC QuakeStudies

A digitally manipulated image of a broken window on Spicer House. The photographer comments, "One of the office blocks in Christchurch City, New Zealand. As the window has not been fixed I am presuming that this building will be slowly demolished at a later date".

Images, UC QuakeStudies

A photograph of the site of a demolished building on Tuam Street which is being used as a car park. The photograph was taken during the Residential Access Project which gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake.

Videos, UC QuakeStudies

A video of an interview with Arts Centre CEO Andre Lovatt about the restoration of the Arts Centre after the 22 February 2011 earthquake. The video also includes a tour of the Arts Centre, including the Boys' High School swimming pool and gymnasium which was exposed after another building was demolished.

Images, UC QuakeStudies

A digitally manipulated image of damaged Music Centre. The photographer comments, "The destruction caused by the demolition of the heritage buildings damaged in the Christchurch earthquakes looks similar to the scenes in London during the second world war. The building was the Catholic Cathedral College, Christchurch. It was an integrated Catholic co-educational secondary school. It was founded in 1987, but its origins go back more than a 100 years earlier. The college was an amalgamation of two schools: Sacred Heart College for girls, and Xavier College for boys".

Images, Alexander Turnbull Library

A chimpanzee paints with a palette of colours. Context: After the earthquakes in Christchurch buildings and areas were designated green, blue, red or white depending on the degree of damage. Buildings in the 'red' zone were then examined to ascertain whether they should be demolished or restored and sometimes the land itself was deemed unsafe. There have been many controversial decisions made which is the point the cartoon makes. Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

A digitally manipulated image of Latimer Square. The photographer comments, "It is so nice to stand in the middle of Latimer Square on a bright Winter's day and forget the havoc that is around you. The square has hardly been touched by the Christchurch earthquake, but it is surrounded by demolished and damaged buildings".

Images, UC QuakeStudies

Two diggers on top of a pile of rubble inside the partially demolished Ozone Dressing Sheds building. The photographer comments, "The Ozone must have suffered in the February earthquake more than people thought. They were starting to repaint it inside, but it looks like they must have run out of filler".

Images, UC QuakeStudies

A photograph of two workers standing in the site of a demolished building on Tuam Street which is being used as a car park. The photograph was taken during the Residential Access Project which gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of Brandon, Elizabeth Ackerman and Danica Nel on the site of a demolished building on Tuam Street. The trio can be seen wearing hard hats and florescent vests. The photograph was taken during the Residential Access Project which gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake.