
A photograph of an excavator clearing rubble on Madras Street near the intersection of Tuam Street. To the left is the earthquake damaged Edward Gibbon's building. To the right, shipping containers have been stacked on the road.
A photograph of an excavator clearing rubble on Madras Street near the intersection of Tuam Street. To the left is the earthquake damaged Edward Gibbon's building. To the right, shipping containers have been stacked on the road.
A photograph of the earthquake damage to Quinns of Papanui Road. The front walls of the store have crumbled, exposing the rooms inside. Wire fencing and road cones have been placed around the building as a cordon.
An entry from Jennifer Middendorf's blog for 30 October 2011 entitled, "Back in the CBD".
An entry from Jennifer Middendorf's blog for 22 February 2012 entitled, "12:51".
An entry from Jennifer Middendorf's blog for 24 February 2011 entitled, "Checking in".
For the first time in November 2011, Christchurch residents finally had the opportunity to see the earthquake-damaged city centre on the Red Zone bus tours organised by CERA. Looking down the new Re:Start Mall as the bus goes down Colombo Street.
A photograph looking south-west along Williams Street, from the Williams Street bridge, in Kaiapoi. In the distance is the rebuilt Blackwell's Department Store. The department store was rebuilt after the previous building was damaged in the 2010 and 2011 Canterbury earthquakes.
The partially-demolished Henry Africa's building. The photographer comments, "A building housing a restaurant and a great little neighbourhood bar is finally coming down because of earthquake damage. Fenced off for safety. People who regularly use Stanmore Rd will be happy when the demolition is complete".
The recent instances of seismic activity in Canterbury (2010/11) and Kaikōura (2016) in New Zealand have exposed an unexpected level of damage to non-structural components, such as buried pipelines and building envelope systems. The cost of broken buried infrastructure, such as pipeline systems, to the Christchurch Council was excessive, as was the cost of repairing building envelopes to building owners in both Christchurch and Wellington (due to the Kaikōura earthquake), which indicates there are problems with compliance pathways for both of these systems. Councils rely on product testing and robust engineering design practices to provide compliance certification on the suitability of product systems, while asset and building owners rely on the compliance as proof of an acceptable design. In addition, forensic engineers and lifeline analysts rely on the same product testing and design techniques to analyse earthquake-related failures or predict future outcomes pre-earthquake, respectively. The aim of this research was to record the actual field-observed damage from the Canterbury and Kaikōura earthquakes of seismic damage to buried pipeline and building envelope systems, develop suitable testing protocols to be able to test the systems’ seismic resilience, and produce prediction design tools that deliver results that reflect the collected field observations with better accuracy than the present tools used by forensic engineers and lifeline analysts. The main research chapters of this thesis comprise of four publications that describe the gathering of seismic damage to pipes (Publication 1 of 4) and building envelopes (Publication 2 of 4). Experimental testing and the development of prediction design tools for both systems are described in Publications 3 and 4. The field observation (discussed in Publication 1 of 4) revealed that segmented pipe joints, such as those used in thick-walled PVC pipes, were particularly unsatisfactory with respect to the joint’s seismic resilience capabilities. Once the joint was damaged, silt and other deleterious material were able to penetrate the pipeline, causing blockages and the shutdown of key infrastructure services. At present, the governing Standards for PVC pipes are AS/NZS 1477 (pressure systems) and AS/NZS 1260 (gravity systems), which do not include a protocol for evaluating the PVC pipes for joint seismic resilience. Testing methodologies were designed to test a PVC pipe joint under various different simultaneously applied axial and transverse loads (discussed in Publication 3 of 4). The goal of the laboratory experiment was to establish an easy to apply testing protocol that could fill the void in the mentioned standards and produce boundary data that could be used to develop a design tool that could predict the observed failures given site-specific conditions surrounding the pipe. A tremendous amount of building envelope glazing system damage was recorded in the CBDs of both Christchurch and Wellington, which included gasket dislodgement, cracked glazing, and dislodged glazing. The observational research (Publication 2 of 4) concluded that the glazing systems were a good indication of building envelope damage as the glazing had consistent breaking characteristics, like a ballistic fuse used in forensic blast analysis. The compliance testing protocol recognised in the New Zealand Building Code, Verification Method E2/VM1, relies on the testing method from the Standard AS/NZS 4284 and stipulates the inclusion of typical penetrations, such as glazing systems, to be included in the test specimen. Some of the building envelope systems that failed in the recent New Zealand earthquakes were assessed with glazing systems using either the AS/NZS 4284 or E2/VM1 methods and still failed unexpectedly, which suggests that improvements to the testing protocols are required. An experiment was designed to mimic the observed earthquake damage using bi-directional loading (discussed in Publication 4 of 4) and to identify improvements to the current testing protocol. In a similar way to pipes, the observational and test data was then used to develop a design prediction tool. For both pipes (Publication 3 of 4) and glazing systems (Publication 4 of 4), experimentation suggests that modifying the existing testing Standards would yield more realistic earthquake damage results. The research indicates that including a specific joint testing regime for pipes and positioning the glazing system in a specific location in the specimen would improve the relevant Standards with respect to seismic resilience of these systems. Improving seismic resilience in pipe joints and glazing systems would improve existing Council compliance pathways, which would potentially reduce the liability of damage claims against the government after an earthquake event. The developed design prediction tool, for both pipe and glazing systems, uses local data specific to the system being scrutinised, such as local geology, dimensional characteristics of the system, actual or predicted peak ground accelerations (both vertically and horizontally) and results of product-specific bi-directional testing. The design prediction tools would improve the accuracy of existing techniques used by forensic engineers examining the cause of failure after an earthquake and for lifeline analysts examining predictive earthquake damage scenarios.
A photograph of the earthquake damage to a church in Christchurch. The gable and top of the side wall have crumbled, and the bricks have fallen onto the pavement below. Police tape has been draped around the building.
A photograph of the earthquake damage to a dairy on the corner of Springfield and Clare Roads. Part of the awning has slumped to the side and wire fencing has been placed around the building as a cordon.
A photograph of the earthquake damage to the Canterbury Provincial Chambers on Durham Street. One of the entrance ways has crumbled, and the rubble has fallen in front. An inner door can be seen, now leading to nowhere.
A photograph of a bedroom on the top storey of an earthquake-damaged house. A section of the bedroom's outside wall has collapsed and the bricks and other rubble have spilled into the bedroom and onto the bed.
Many buildings with relatively low damage from the 2010-2011 Canterbury were deemed uneconomic to repair and were replaced [1,2]. Factors that affected commercial building owners’ decisions to replace rather than repair, included capital availability, uncertainty with regards to regional recovery, local market conditions and ability to generate cash flow, and repair delays due to limited property access (cordon). This poster provides a framework for modeling decision-making in a case where repair is feasible but replacement might offer greater economic value – a situation not currently modeled in engineering risk analysis.
A photograph of the earthquake damage to the Art Gallery Apartments on Gloucester Street. Both windows on the second floor of the building are broken. USAR codes have been spray painted on one of the bottom-storey windows.
A photograph of emergency management personnel standing in front of a block of earthquake-damaged buildings on Manchester Street. Large piles of rubble line the street. In the foreground a parked car has been crushed by falling rubble.
A photograph looking east up Cashel Street towards Colombo Street. Rubble from earthquake-damaged buildings is piled on both sides of the street. A van has been crushed by the rubble on the left side of the street.
A photograph of earthquake damage to the ChristChurch Cathedral in Cathedral Square. The tower has been partially demolished and a pile of rubble sits in front. A Daniel Smith Industries Ltd crane is sitting to the left.
A photograph of the earthquake damage to the former St Albans Library on Colombo Street. Parts of the walls have crumbled, the bricks spilling onto the pavement. Wire fencing has been placed around the building as a cordon.
A photograph looking south down Poplar Lane from the intersection of Lichfield Street. Bricks from earthquake-damaged buildings litter the lane. A car parked on the right side of the lane has been crushed by the falling bricks.
A photograph of an earthquake-damaged building on St Asaph Street. Bricks and other rubble are scattered across the footpath to the right. Emergency tape has been draped over the driveway next to the building as a cordon.
A photograph of emergency management personnel photographing the earthquake damage to the back of the Winnie Bagoes building on Gloucester Street. The top of the building has collapsed and fallen into the building and out onto the street.
A photograph of emergency management personnel photographing the earthquake damage to the back of the Winnie Bagoes building on Gloucester Street. The top of the building has collapsed and fallen into the building and out onto the street.
A photograph looking north up Colombo Street from the intersection with Gloucester Street. Rubble from earthquake-damaged buildings is sitting on both sides of the street. The road has been closed ahead with plastic fencing and road cones.
A photograph of the Wellington Emergency Management Office, taking photos of St Paul's Church in Dallington. The church was severely damaged after the 4 September earthquake. Police emergency tape can be seen around the building, keeping people away.
A photograph of earthquake damage to the ChristChurch Cathedral in Cathedral Square. The tower has been partially demolished and a pile of rubble sits in front. A Daniel Smith Industries Ltd crane is sitting to the left.
Oxford Terrace Baptist Church on the corner of Madras St and Oxford Terrace, and alongside the Central City Fire Station on Kilmore St.
A photograph captioned by BeckerFraserPhotos, "The Carlton Country Club at 1 Papanui Road in Merivale. This is the former site of the historic Carlton Hotel, built 1906, damaged by the earthquakes and demolished on 9 April 2011".
A photograph of the earthquake damage to the Dallington Discount Market on the corner of Woodham Road and Gloucester Street. The side wall has collapsed onto the street. A tarpaulin has been taped over the hole as weather proofing.