
Damage to Dallington Discount Market on the corner of Gloucester Street and Woodham Road, the facade of which has collapsed during the 4 September 2010 earthquake. The building has been cordoned off with a safety fence.
A photograph of the earthquake damage to the White's Building on Tuam Street, visible through a broken window. The roof of the building has collapsed into the building, a plank of wood breaking through the window.
Damage to Dallington Discount Market on the corner of Gloucester Street and Woodham Road, the facade of which has collapsed during the 4 September 2010 earthquake. The building has been cordoned off with a safety fence.
Damage to Dallington Discount Market on the corner of Gloucester Street and Woodham Road, the facade of which has collapsed during the 4 September 2010 earthquake. The building has been cordoned off with a safety fence.
A review of the literature showed the lack of a truly effective damage avoidance solution for timber or hybrid timber moment resisting frames (MRFs). Full system damage avoidance selfcentring behaviour is difficult to achieve with existing systems due to damage to the floor slab caused by beam-elongation. A novel gravity rocking, self-centring beam-column joint with inherent and supplemental friction energy dissipation is proposed for low-medium rise buildings in all seismic zones where earthquake actions are greater than wind. Steel columns and timber beams are used in the hybrid MRF such that both the beam and column are continuous thus avoiding beam-elongation altogether. Corbels on the columns support the beams and generate resistance and self-centring through rocking under the influence of gravity. Supplemental friction sliders at the top of the beams resist sliding of the floor whilst dissipating energy as the floor lifts on the corbels and returns. 1:20 scale tests of 3-storey one-by-two bay building based on an earlier iteration of the proposed concept served as proof-of-concept and highlighted areas for improvement. A 1:5 scale 3-storey one-by-one bay building was subsequently designed. Sub-assembly tests of the beam-top asymmetric friction sliders demonstrated repeatable hysteresis. Quasi-static tests of the full building demonstrated a ‘flat bottomed’ flag-shaped hysteresis. Shake table tests to a suite of seven earthquakes scaled for Wellington with site soil type D to the serviceability limit state (SLS), ultimate limit state (ULS) and maximum credible event (MCE) intensity corresponding to an average return period of 25, 500 and 2500 years respectively were conducted. Additional earthquake records from the 22 February 2011 Christchurch earthquakes we included. A peak drift of 0.6%, 2.5% and 3.8% was reached for the worst SLS, ULS and MCE earthquake respectively whereas a peak drift of 4.5% was reached for the worst Christchurch record for tests in the plane of the MRF. Bi-directional tests were also conducted with the building oriented at 45 degrees on the shake table and the excitation factored by 1.41 to maintain the component in the direction of the MRF. Shear walls with friction slider hold-downs which reached similar drifts to the MRF were provided in the orthogonal direction. Similar peak drifts were reached by the MRF in the bi-directional tests, when the excitation was amplified as intended. The building self-centred with a maximum residual drift of 0.06% in the dynamic tests and demonstrated no significant damage. The member actions were magnified by up to 100% due to impact upon return of the floor after uplift when the peak drift reached 4.5%. Nonetheless, all of the members and connections remained essentially linearelastic. The shake table was able to produce a limited peak velocity of 0.275 m/s and this limited the severity of several of the ULS, MCE and Christchurch earthquakes, especially the near-field records with a large velocity pulse. The full earthquakes with uncapped velocity were simulated in a numerical model developed in SAP2000. The corbel supports were modelled with the friction isolator link element and the top sliders were modelled with a multi-linear plastic link element in parallel with a friction spring damper. The friction spring damper simulated the increase in resistance with increasing joint rotation and a near zero return stiffness, as exhibited by the 1:5 scale test building. A good match was achieved between the test quasi-static global force-displacement response and the numerical model, except a less flat unloading curve in the numerical model. The peak drift from the shake table tests also matched well. Simulations were also run for the full velocity earthquakes, including vertical ground acceleration and different floor imposed load scenarios. Excessive drift was predicted by the numerical model for the full velocity near-field earthquakes at the MCE intensity and a rubber stiffener for increasing the post joint-opening stiffness was found to limit the drift to 4.8%. Vertical ground acceleration had little effect on the global response. The system generates most of its lateral resistance from the floor weight, therefore increasing the floor imposed load increased the peak drift, but less than it would if the resistance of the system did not increase due to the additional floor load. A seismic design procedure was discussed under the framework of the existing direct displacement-based design method. An expression for calculating the area-based equivalent viscous damping (EVD) was derived and a conservative correction factor of 0.8 was suggested. A high EVD of up to about 15% can be achieved with the proposed system at high displacement ductility levels if the resistance of the top friction sliders is maximised without compromising reliable return of the floor after uplift. Uniform strength joints with an equal corbel length up the height of the building and similar inter-storey drifts result in minimal relative inter-floor uplift, except between the first floor and ground. Guidelines for detailing the joint for damage avoidance including bi-directional movement were also developed.
An earthquake-damaged building on Ferry Road. A silver tarpaulin has been used to weather proof a section of the building where masonry has fallen away, and a safety fence has been erected at the building's base.
Cordon fencing around the Arts Centre on Worcester Boulevard. Men with hard hats and hi-vis vests are entering the building. Wooden bracing has been placed on the gable on the tower to limit further earthquake damage.
The Edmonds Band Rotunda on the bank of the Avon River, Cambridge Terrace. The brickwork of the building has been damaged by the earthquake and wire fencing has been placed around the building to keep people away.
A photograph of the ChristChurch Cathedral showing the damage to the west wall and steel bracing. In the foreground is the plinth where a statue of John Robert Godley stood prior to the February 2011 earthquake.
For the first time in November 2011, Christchurch residents finally had the opportunity to see the earthquake-damaged city centre on the Red Zone bus tours organised by CERA. Partial view of the Citizens' War Memorial beside the cathedral.
An entry from Jennifer Middendorf's blog for 4 September 2011 entitled, "One Year On".
An entry from Jennifer Middendorf's blog for 19 March 2012 entitled, "Time to catch up".
For the first time in November 2011, Christchurch residents finally had the opportunity to see the earthquake-damaged city centre on the Red Zone bus tours organised by CERA. The Regent Theatre dome which has been removed from the building.
For the first time in November 2011, Christchurch residents finally had the opportunity to see the earthquake-damaged city centre on the Red Zone bus tours organised by CERA. Looking into Cathedral Square, the Regent Theatre dome can be partially seen.
Detail of the partially-demolished Henry Africa's building. The photographer comments, "A building housing a restaurant and a great little neighbourhood bar is finally coming down because of earthquake damage. Henry's doorway. Still standing - the zebra striped doorway into Henry Africa's".
Detail of the partially-demolished Henry Africa's building. The photographer comments, "A building housing a restaurant and a great little neighbourhood bar is finally coming down because of earthquake damage. Henry's doorway. Still standing - the zebra striped doorway into Henry Africa's".
Tents set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
Tents set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.
Photograph captioned by BeckerFraserPhotos, "A detail of the new Christchurch Press building. This facade is a replica of the previous Press building's facade which was badly damaged in the 22 February 2011 earthquake".
A photograph of a member of an emergency management team in a room inside an earthquake-damaged house. The chimney and fireplace in the room have collapsed and the bricks have spilled across the floor.
A photograph of the earthquake damage to a building on the corner of Manchester Street and Struthers Lane. The front wall of the building has crumbled, exposing the rooms inside. One is covered in graffiti.
A photograph of the earthquake damage to the Canterbury Provincial Chambers. The top section of the building has crumbled, taking the scaffolding with it. Wire fencing has been placed around the building as a cordon.
A photograph of a cordon made from wire fencing, road cones and tape on the intersection of Manchester and Welles Streets. In the background, bricks from a earthquake-damaged building are piled on the footpath.
A photograph of the earthquake damage to the back of a building on Madras Street. The outer walls of the building have collapsed and the bricks and other rubble have spilled onto the car park.
A photograph of the earthquake damage to the Cranmer Centre on the corner of Montreal and Armagh Streets. The front wall of the building has crumbled, and the bricks have spilt onto the pavement below.
A photograph of emergency management personnel inspecting the earthquake damage to a concrete beam inside a building. The concrete near the bottom of the beam has crumbled and the steel reinforcement inside is now exposed.
A photograph of earthquake damage to the Canterbury Provincial Chambers Buildings, taken from Oxford Terrace, across the Avon River. One of the chimneys has fallen onto the roof, knocking off tiles and pieces of masonry.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team inside an earthquake-damaged house. One of the ERT members is climbing a staircase covered in rubble from a collapsed interior wall.
A photograph of a cordon made from wire fencing, road cones and tape on the intersection of Manchester and Welles Streets. In the background, bricks from a earthquake-damaged building are piled on the footpath.
Tents set up in the Arts car park at the University of Canterbury after the 22 February 2011 earthquake. The tents were used as temporary lecture rooms while the buildings were being checked for damage.