Search

found 4358 results

Research papers, University of Canterbury Library

Introduction In 2011 Christchurch city centre was partially destroyed by an earthquake. Government-led anchor projects were tasked with bringing Christchurch back from rubble. After a period of 7 years out of 16 proposed projects, 10 are already over time for their initial completion dates and the ones completed, are under scrutiny for failing to deliver their expected outcome.

Audio, Radio New Zealand

Building plans signed off by the Christchurch City Council show one of its own structural engineers was involved in the design of a new multistorey building that is unstable. The eight-storey office building at 230 High Street is off-limits as it is too weak and might 'rupture' in an earthquake. But the council insists the planning documents are wrong and its engineer had only a minor role. Phil Pennington reports.

Videos, UC QuakeStudies

A video of a tour through the Christchurch central city Red Zone in July 2011. The video includes footage of Colombo Street, Gloucester Street, the ChristChurch Cathedral, Worcester Street, the Press Building, the Whitcoulls Building, Cashel Mall, and High Street. It also includes an interview with Earthquake Recovery Minister Gerry Brownlee.

Videos, UC QuakeStudies

A video of the Christchurch central city covered in snow. The video includes footage of the ChristChurch Cathedral, Gloucester Street, New Regent Street, Manchester Street, Latimer Square, Centennial Pool, Armagh Street, McLeans Mansion, Hagley Park, Rolleston Avenue, Worcester Street, the Peacock Fountain in the Botanic Gardens, and Dyers Pass Road.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "New Zealand's Governor-General Anand Satyanand and his wife Susan Satyanand visited sites around earthquake stricken Canterbury today. (L-R) Selwyn District mayor Kelvin Coe, Christchurch city councillor Bob Shearing, Lady Susan and Governor-General Anand Satyanand visit badly affected Halswell Primary School".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "New Zealand's Governor-General Anand Satyanand and his wife Susan Satyanand visited sites around earthquake stricken Canterbury today. (L-R) Selwyn District mayor Kelvin Coe, Christchurch city councillor Bob Shearing, Lady Susan and Governor-General Anand Satyanand visit badly affected Halswell Primary School".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "New Zealand's Governor-General Anand Satyanand and his wife Susan Satyanand visited sites around earthquake stricken Canterbury today. (L-R) Selwyn District mayor Kelvin Coe, Christchurch city councillor Bob Shearing, Lady Susan and Governor-General Anand Satyanand visit badly affected Halswell Primary School".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "New Zealand's Governor-General Anand Satyanand and his wife Susan Satyanand visited sites around earthquake stricken Canterbury today. (L-R) Selwyn District mayor Kelvin Coe, Christchurch city councillor Bob Shearing, Lady Susan and Governor-General Anand Satyanand visit badly affected Halswell Primary School".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "New Zealand's Governor-General Anand Satyanand and his wife Susan Satyanand visited sites around earthquake stricken Canterbury today. (L-R) Selwyn District mayor Kelvin Coe, Christchurch city councillor Bob Shearing, Lady Susan and Governor-General Anand Satyanand visit badly affected Halswell Primary School".

Audio, Radio New Zealand

Construction delays and cost over-runs are prolonging the earthquake risks facing patients and staff at Christchurch hospital. Six major hospital buildings at the central city site have been listed as earthquake prone since May, but there is no safer space to shift patients into. Christchurch Hospital boss David Meates pron; Mates says the hospital is still basically a construction site. One earthquake prone building has roof tanks containing 75 tonnes of water. Mr Meates told RNZ reporter Phil Pennington removing the water from the tanks in the meantime is not an option.

Videos, UC QuakeStudies

A video about the Christchurch central city in the days after the 4 September 2010 earthquake. The video includes footage of empty streets, and New Zealand Police and Army members guarding the cordons. It also includes footage of engineers checking the safety of buildings.

Images, UC QuakeStudies

A photograph of Danica Nel and other workers standing in line with their authorization forms for the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake.

Articles, UC QuakeStudies

A copy of a letter from Hugo Kristinsson which was sent to Prince William, the Duke of Cambridge, on 2 March 2014 . The letter was sent on behalf of Empowered Christchurch, as a response to the letter read by the Prince at the official Civic Memorial Service on the 22 February 2014. Kristinsson thanks the Prince for his letter and updates him on the progress of the rebuild. He expresses his respect for King George VI and Queen Elizabeth for their compassion in the early 1940s to the victims of bombing raids during the war and acknowledge's Prince William and Prince Harry's philanthropy through The Royal Foundation of the Duke and Duchess of Cambridge and Prince Harry and The Princes' Charities Forum. Lastly he implores the Prince and the Duchess of Cambridge to visit residents from the 'low-lying seaside side of the city' who 'feel that their plight has been trivialised by the authorities in favour of prestigious big-budget projects'.

Images, UC QuakeStudies

A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Risk Acceptance. It is the role of insurance companies, the EQC included, to accept the risks covered under their terms of reference/policies and compensate policyholders when such risks eventuate. However, many policyholders in Christchurch have not been compensated for the damage to their homes and their lives. These responsibilities need to be faced by the entities responsible. An equitable solution needs to be found for properties with hazards such as flooding that are a direct result of the earthquakes. In tandem with this, every effort must be made to protect residents from the risks posed by climate change. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents".