A photograph of a corridor in the Diabetes Centre. Plastic sheeting has been used to cover the carpet while the corridor is repaired.
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work at a house on Hackthorne Road, Cashmere".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Victoria Square, the slightly less famous cousin of nearby Cathedral Square was re-opened today following $7.5 million worth of earthquake repairs.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Repairs in progress on this High Street shop; aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Canterbury earthquake victims with the most damaged homes could have to wait more than two and half years for their houses to be fixed - but one owner says her problems are nothing compared to the misery of the Pike River mine disaster.
The Earthquake Recovery Minister Gerry Brownlee says all but a few Cantabrians will be able to rebuild on their original properties.
Reinforced concrete (RC) frame buildings designed according to modern design standards achieved life-safety objectives during the Canterbury earthquakes in 2010-11 and the Kaikōura earthquake in 2016. These buildings formed ductile plastic hinges as intended and partial or total building collapse was prevented. However, despite the fact that the damage level of these buildings was relatively low to moderate, over 60% of multi-storey RC buildings in the Christchurch central business district were demolished due to insufficient insurance coverage and significant uncertainty in the residual capacity and repairability of those buildings. This observation emphasized an imperative need to improve understanding in evaluating the post-earthquake performance of earthquake-damaged buildings and to develop relevant post-earthquake assessment guidelines. This thesis focuses on improving the understanding of the residual capacity and repairability of RC frame buildings. A large-scale five-storey RC moment-resisting frame building was tested to investigate the behaviour of earthquake-damaged and repaired buildings. The original test building was tested with four ground motions, including two repeated design-level ground motions. Subsequently, the test building was repaired using epoxy injection and mortar patching and re-tested with three ground motions. The test building was assessed using key concepts of the ATC-145 post-earthquake assessment guideline to validate its assessment procedures and highlight potential limitations. Numerical models were developed to simulate the peak storey drift demand and identify damage locations. Additionally, fatigue assessment of steel reinforcement was conducted using methodologies as per ATC-145. The residual capacity of earthquake-strained steel reinforcement was experimentally investigated in terms of the residual fatigue capacity and the residual ultimate strain capacity. In addition to studying the fatigue capacity of steel reinforcement, the fatigue damage demand was estimated using 972 ground motion records. The deformation limit of RC beams and columns for damage control was explored to achieve a low likelihood of requiring performance-critical repair. A frame component test database was developed, and the deformation capacity at the initiation of lateral strength loss was examined in terms of the chord rotation, plastic rotation and curvature ductility capacity. Furthermore, the proposed curvature ductility capacity was discussed with the current design curvature ductility limits as per NZS 3101:2006.
The purpose of this research is to investigate men’s experiences of the 2016 7.8 magnitude Kaikōura earthquake and Tsunami. While, research into the impacts of the earthquake has been conducted, few studies have examined how gender shaped people’s experiences of this natural hazard event. Analysing disasters through a gender lens has significantly contributed to disaster scholarship in identifying the resilience and vulnerabilities of individuals and communities pre- and post-disaster (Fordham, 2012; Bradshaw, 2013). This research employs understandings of masculinities (Connell, 2005), to examine men’s strengths and challenges in responding, recovering, and coping following the earthquake. Qualitative inquiry was carried out in Northern Canterbury and Marlborough involving 18 face-to-face interviews with men who were impacted by the Kaikōura earthquake and its aftermath. Interview material is being analysed using thematic and narrative analysis. Some of the preliminary findings have shown that men took on voluntary roles in addition to their fulltime paid work resulting in long hours, poor sleep and little time spent with family. Some men assisted wives and children to high ground then drove into the tsunami zone to check on relatives or to help evacuate people. Although analysis of the findings is currently ongoing, preliminary findings have identified that the men who participated in the study have been negatively impacted by the 2016 Kaikōura earthquake. A theme identified amongst participants was an avoidance to seek support with the challenges they were experiencing due to the earthquake. The research findings align with key characteristics of masculinity, including demonstrating risky behaviours and neglecting self or professional care. This study suggests that these behaviours affect men’s overall resilience, and thus the resilience of the wider community.
None
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A Christchurch construction firm says businesses who are complaining about losing money on earthquake repair jobs should work more closely with their project managers.
Two years on from the February twenty second earthquake, large parts of Christchurch Hospital are a construction site as repairs to damaged wards continue.
The owners of more than three-thousand properties damaged by the Canterbury earthquake have been told the repair job could take nearly three years.
Fletcher Construction has won the largest building contract in New Zealand history to repair half of the Canterbury homes damaged in last month's earthquake.
Christchurch council has asked its residents to tell it if earthquake repairs haven't been done so it can accurately assess their property's value.
A photograph captioned by BeckerFraserPhotos, "Christ's College, Rolleston Avenue. Damage to the top of this building has had temporary repairs carried out".
A photograph of a bathroom in the Diabetes Centre which has been prepared for repairs. A tarpaulin has been used to cover the floor.
A photograph of an office in the Diabetes Centre. The office furniture has been pushed together to prepare the room for earthquake repair work.
A variation to the consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.