Search

found 6682 results

Images, eqnz.chch.2010

Photos taken in Lyttelton showing the demolition of various buildings following the February 22 earthquake. File reference: CCL-2011-04-29-Lyttelton-Demolition-P1120224 From the collection of Christchurch City Libraries.

Images, UC QuakeStudies

People walk down the newly re-opened Colombo Street. In the distance, Mike Hewson's installation "Deconstruction" can be seen on the walkway between Ballantynes and The Crossing. This artwork gives the illusion that the walkway has been removed.

Images, UC QuakeStudies

People walk down the newly re-opened Colombo Street. In the distance, Mike Hewson's installation "Deconstruction" can be seen on the walkway between Ballantynes and The Crossing. This artwork gives the illusion that the walkway has been removed.

Images, UC QuakeStudies

People walk down the newly re-opened Colombo Street. In the distance, Mike Hewson's installation "Deconstruction" can be seen on the walkway between Ballantynes and The Crossing. This artwork gives the illusion that the walkway has been removed.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Videos, UC QuakeStudies

A video of the new Red Bus rebuild tour which is to replace the Red Zone tour now that the cordons have lifted. The video includes footage of the tour, as well as a speech by Red Bus Chief Executive Paul McNoe.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Audio, Radio New Zealand

A huge milestone in the rebuild of the Christchurch Cathedral. Twelves years since the Canterbury earthquakes caused extensive damage to the building, community leaders and project managers have gathered inside the cathedral this morning for the first time since the quakes. It also marks the completion of stablisation phase of the project. Our reporter Adam Burns went along.

Images, eqnz.chch.2010

It's five years since the earthquake, and for the first time I feel a sense that the rebuild is taking effect. 113/115 - Natural Framing. In the middle of the rebuild, wall murals are everywhere is Christchurch. The framing is wire fence around ballet dancer, although there is plenty of evidence of framing/boxing around the foundations.

Images, UC QuakeStudies

A worker in a high visibility vest and a hard hat repairing and strengthening the outside of a building at the University of Canterbury. The photograph has been captioned by BeckerFraserPhotos, "The repair work on the buildings at the University of Canterbury looks similar to the scenes in the CBD".

Images, UC QuakeStudies

A photograph of earthquake repairs underway in the quad of Christ's College on Rolleston Avenue. A sign on the gate read, "Quake repairs, keep out". Tape reading, "Danger keep out" has been draped across both gates . In the background is a crane, several workers in high-visibility clothing, and building supplies.