The "Lyttelton Review" newsletter for 1 October 2012, produced by the Lyttelton Harbour Information Centre.
The seismic performance and parameter identification of the base isolated Christchurch Women’s Hospital (CWH) building are investigated using the recorded seismic accelerations during the two large earthquakes in Christchurch. A four degrees of freedom shear model is applied to characterize the dynamic behaviour of the CWH building during these earthquakes. A modified Gauss-Newton method is employed to identify the equivalent stiffness and Rayleigh damping coefficients of the building. The identification method is first validated using a simulated example structure and finally applied to the CWH building using recorded measurements from the Mw 6.0 and Mw 5.8 Christchurch earthquakes on December 23, 2011. The estimated response and recorded response for both earthquakes are compared with the cross correlation coefficients and the mean absolute percentage errors reported. The results indicate that the dynamic behaviour of the superstructure and base isolator was essentially within elastic range and the proposed shear linear model is sufficient for the prediction of the structural response of the CWH Hospital during these events.
An entry from Jennifer Middendorf's blog for 23 February 2011 entitled, "We're evacuating".
A story submitted by Anonymous to the QuakeStories website.
The Canterbury earthquakes of 2010 and 2011 caused significant damage and disruption to the city of Christchurch, New Zealand. A Royal Commission was established to report on the causes of building failure as a result of the earthquakes as well as look at the legal and best-practice requirements for buildings in New Zealand Central Business Districts. The Royal Commission made 189 recommendations on a variety of matters including managing damaged buildings after an earthquake, the adequacy of building codes and standards, and the processes of seismic assessments of existing buildings to determine their earthquake vulnerability. In response the Ministry of Business, Innovation and Employment, the agency responsible for administering building regulation in New Zealand, established a work programme to assist with the Canterbury rebuild and to implement the lessons learned throughout New Zealand. The five primary work streams in the programme are: • Facilitating the Canterbury Rebuild • Structural Performance and Design Standards • Geotechnical and structural guidance • Existing Building Resilience • Post Disaster Building Management This paper provides more detail on each of the work streams. There has been significant collaboration between the New Zealand Government and the research community, technical societies, and engineering consultants, both within New Zealand and internationally, to deliver the programme and improve the resilience of the New Zealand built environment. This has presented major challenges for an extremely busy industry in the aftermath of the Canterbury earthquakes. The paper identifies the items of work that have been completed and the work that is still in progress at the time of writing.
We examined the stratigraphy of alluvial fans formed at the steep range front of the Southern Alps at Te Taho, on the north bank of the Whataroa River in central West Coast, South Island, New Zealand. The range front coincides with the Alpine Fault, an Australian-Pacific plate boundary fault, which produces regular earthquakes. Our study of range front fans revealed aggradation at 100- to 300-year intervals. Radiocarbon ages and soil residence times (SRTs) estimated by a quantitative profile development index allowed us to elucidate the characteristics of four episodes of aggradation since 1000 CE. We postulate a repeating mode of fan behaviour (fan response cycle [FRC]) linked to earthquake cycles via earthquake-triggered landslides. FRCs are characterised by short response time (aggradation followed by incision) and a long phase when channels are entrenched and fan surfaces are stable (persistence time). Currently, the Te Taho and Whataroa River fans are in the latter phase. The four episodes of fan building we determined from an OxCal sequence model correlate to Alpine Fault earthquakes (or other subsidiary events) and support prior landscape evolution studies indicating ≥M7.5 earthquakes as the main driver of episodic sedimentation. Our findings are consistent with other historic non-earthquake events on the West Coast but indicate faster responses than other earthquake sites in New Zealand and elsewhere where rainfall and stream gradients (the basis for stream power) are lower. Judging from the thickness of fan deposits and the short response times, we conclude that pastoral farming (current land-use) on the fans and probably across much of the Whataroa River fan would be impossible for several decades after a major earthquake. The sustainability of regional tourism and agriculture is at risk, more so because of the vulnerability of the single through road in the region (State Highway 6).
The Government's response to the Canterbury earthquake, and the South Canterbury Finance bail-out and republicanism.
A story submitted by Jo Nicholls-Parker and Petra Van Asten to the QuakeStories website.
A pdf transcript of Liz Kivi's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Joshua Black. Transcriber: Josie Hepburn.
A pdf transcript of Participant number EG138's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Samuel Hope. Transcriber: Samuel Hope.
A pdf transcript of Sarah Shaw's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Samuel Hope. Transcriber: Samuel Hope.
An entry from Jennifer Middendorf's blog for 21 January 2014 entitled, "Weekend wanderings".
An entry from Ruth Gardner's blog for 17 August 2011 entitled, "Local Lyrics".
An entry from Roz Johnson's blog for 23 February 2013 entitled, "Flower Cones".
An entry from Roz Johnson's blog for 18 June 2012 entitled, "Cunningham Terrace".
A story submitted by Hebe Kearney to the QuakeStories website.
None
A copy of the CanCERN online newsletter published on 23 August 2013
The "Lyttelton Review" newsletter for 13 February 2012, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 14 May 2012, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 27 February 2012, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 25 July 2011, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 29 August 2011, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 12 September 2011, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 15 August 2011, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 22 August 2011, produced by the Lyttelton Harbour Information Centre.
Transcript of Nicolas Warren's earthquake story, captured by the UC QuakeBox project.
Members of the USAID Disaster Assistance Response Team (DART) standing on the edge of the Smiths City car park, which was severely damaged during the 22 February 2011 earthquake.
Members of the USAID Disaster Assistance Response Team (DART) sitting on the edge of the Smiths City car park, which was severely damaged during the 22 February 2011 earthquake.
A pdf transcript of Chris's second earthquake story, captured by the UC QuakeBox Take 2 project. Interviewer: Joshua Black. Transcriber: Caleb Middendorf.