An exposed concrete wall.
An exposed concrete wall.
Concrete blocks form a temporary retaining wall on Dublin Street in Lyttelton.
As a result of the Canterbury earthquakes, over 60% of the concrete buildings in the Christchurch Central Business District have been demolished. This experience has highlighted the need to provide guidance on the residual capacity and repairability of earthquake-damaged concrete buildings. Experience from 2010 Chile indicates that it is possible to repair severely damaged concrete elements (see photo at right), although limited testing has been performed on such repaired components. The first phase of this project is focused on the performance of two lightly-reinforced concrete walls that are being repaired and re-tested after damage sustained during previous testing.
A cracked concrete wall on Avonside Drive.
A photograph of members of the New Zealand Army deconstructing a concrete block wall.
A photograph captioned by BeckerFraserPhotos, "Retaining walls at the port, where the historic stone covering the concrete has collapsed".
The 2010-2011 Christchurch earthquakes generated damage in several Reinforced Concrete (RC) buildings, which had RC walls as the principal resistant element against earthquake demand. Despite the agreement between structural engineers and researchers in an overall successfully performance there was a lack of knowledge about the behaviour of the damaged structures, and even deeper about a repaired structure, which triggers arguments between different parties that remains up to these days. Then, it is necessary to understand the capacity of the buildings after the earthquake and see how simple repairs techniques improve the building performance. This study will assess the residual capacity of ductile slender RC walls according to current standards in New Zealand, NZS 3101.1 2006 A3. First, a Repaired RC walls Database is created trying to gather previous studies and to evaluate them with existing international guidelines. Then, an archetype building is designed, and the wall is extracted and scaled. Four half-scale walls were designed and will be constructed and tested at the Structures Testing Laboratory at The University of Auckland. The overall dimensions are 3 [m] height, 2 [m] length and 0.175 [m] thick. All four walls will be identical, with differences in the loading protocol and the presence or absence of a repair technique. Results are going to be useful to assess the residual capacity of a damaged wall compare to the original behaviour and also the repaired capacity of walls with simpler repair techniques. The expected behaviour is focussed on big changes in stiffness, more evident than in previously tested RC beams found in the literature.
Damage in a residential property in Richmond. A concrete block wall has collapsed. The photographer comments, "Collapsed concrete block fence".
Damage in a residential property in Richmond. A concrete block wall has collapsed. The photographer comments, "Collapsed concrete block fence".
A temporary retaining wall on Sumner Road in Lyttelton. The concrete moulds for the wall are filled with rocks and stones. Black tarpaulins have been placed over the top section of the wall.
High demolition rates were observed in New Zealand after the 2010-2011 Canterbury Earthquake Sequence despite the success of modern seismic design standards to achieve required performance objectives such as life safety and collapse prevention. Approximately 60% of the multi-storey reinforced concrete (RC) buildings in the Christchurch Central Business District were demolished after these earthquakes, even when only minor structural damage was present. Several factors influenced the decision of demolition instead of repair, one of them being the uncertainty of the seismic capacity of a damaged structure. To provide more insight into this topic, the investigation conducted in this thesis evaluated the residual capacity of moderately damaged RC walls and the effectiveness of repair techniques to restore the seismic performance of heavily damaged RC walls. The research outcome provided insights for developing guidelines for post-earthquake assessment of earthquake-damaged RC structures. The methodology used to conduct the investigation was through an experimental program divided into two phases. During the first phase, two walls were subjected to different types of pre-cyclic loading to represent the damaged condition from a prior earthquake, and a third wall represented a repair scenario with the damaged wall being repaired using epoxy injection and repair mortar after the pre-cyclic loading. Comparisons of these test walls to a control undamaged wall identified significant reductions in the stiffness of the damaged walls and a partial recovery in the wall stiffness achieved following epoxy injection. Visual damage that included distributed horizontal and diagonal cracks and spalling of the cover concrete did not affect the residual strength or displacement capacity of the walls. However, evidence of buckling of the longitudinal reinforcement during the pre-cyclic loading resulted in a slight reduction in strength recovery and a significant reduction in the displacement capacity of the damaged walls. Additional experimental programs from the literature were used to provide recommendations for modelling the response of moderately damaged RC walls and to identify a threshold that represented a potential reduction in the residual strength and displacement capacity of damaged RC walls in future earthquakes. The second phase of the experimental program conducted in this thesis addressed the replacement of concrete and reinforcing steel as repair techniques for heavily damaged RC walls. Two walls were repaired by replacing the damaged concrete and using welded connections to connect new reinforcing bars with existing bars. Different locations of the welded connections were investigated in the repaired walls to study the impact of these discontinuities at the critical section. No significant changes were observed in the stiffness, strength, and displacement capacity of the repaired walls compared to the benchmark undamaged wall. Differences in the local behaviour at the critical section were observed in one of the walls but did not impact the global response. The results of these two repaired walls were combined with other experimental programs found in the literature to assemble a database of repaired RC walls. Qualitative and quantitative analyses identified trends across various parameters, including wall types, damage before repair, and repair techniques implemented. The primary outcome of the database analysis was recommendations for concrete and reinforcing steel replacement to restore the strength and displacement capacity of heavily damaged RC walls.
A photograph of the earthquake damage to a concrete beam inside a building. The wall around the beam has been removed to access the beam. Concrete near the bottom of the beam has crumbled and the steel reinforcement inside is now exposed.
Photograph captioned by BeckerFraserPhotos, "Brougham Street painted concrete wall".
A crack in the concrete wall of a block of shops in Kaiapoi.
A crack in the concrete wall of a block of shops in Kaiapoi.
A detail of damage to the interior wall of the Durham Street Methodist Church. Plaster and concrete have fallen away from the wall, baring the stone work.
A photograph of flying pigs painted on concrete blocks in a retaining wall. The photograph is captioned by BeckerFraserPhotos, "Decorated retaining wall in Cunningham Terrace, Lyttelton".
A photograph of the earthquake damage to a building on Oxford Terrace. The wall in front of the car park has collapsed, the concrete blocks spilling onto the footpath in front.
A photograph of a flying pig painted on a concrete block in a retaining wall. The photograph is captioned by BeckerFraserPhotos, "Decorated retaining wall in Cunningham Terrace, Lyttelton".
Damage to a car parking building on Lichfield Street. Part of the concrete wall has crumbled, exposing steel reinforcing rods within, and damaging an artwork painted on the wall.
A photograph of a blue moon painted on a concrete block in a retaining wall. The photograph is captioned by BeckerFraserPhotos, "Decorated retaining wall in Cunningham Terrace, Lyttelton".
A patch of brickwork from a demolished building remains on the concrete wall of the adjoining building.
A photograph of the earthquake-damaged to a house in Christchurch. The far wall has collapsed and many of the concrete blocks have spilled into the garden in front. Emergency tape has been draped in front of the wall as a cordon. A red sticker has also been stuck on the furthest window, indicating that the house is unsafe to enter.
A photograph of a tag on a wall made of concrete blocks. The wall is near the railway tracks which run under the Durham Street over bridge. The tag reads, "JFK".
A photograph captioned by BeckerFraserPhotos, "A warning sign spray-painted on a concrete wall in Manchester Street".
A house on Dorset Street with a damaged retaining wall. The concrete blocks have been stacked on the footpath in front.
A cracked wall made from rocks and concrete in Clifton. The words, "No. 5 The Spur", have been painted on it.
A photograph of large bags of concrete supporting a retaining wall. The photograph is captioned by BeckerFraserPhotos, "Cunningham Terrace, Lyttelton".
Seen through a cordon fence, traces of bricks from a demolished building adhere to the concrete wall of the adjoining building, also being demolished.