
Laura and Max return to Christchurch from their holiday in California and inspect the earthquake-caused sand volcano in their front lawn.
The side wall of the building on the left collapsed onto their roof, collapsing it into the stonemasons store. Several gravestones were also damaged!
Heaving and subsidence on the faultline left scars where the magnitude 7.1 earthquake on Saturday 4 September 2010 originated.
A common scene around Christchurch, following the 7.1 magnitude earthquake that hit the city on Saturday September 4, 2010 at around 4:33am. The shake left many roads cracked, buildings demolished, and flooding in the streets.
If you look very closely, running from the nearest right desk to the second desk on the left hand side, you can see my 'fault-line', - the crack that runs the length of the classroom under the lino.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
Falling gable of the Anglican Community of the Sacred Name building left a gaping hole in the roof in the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010. The chimney would have toppled as well had it not been braced.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The center of the river has slumped and the two banks have moved about a meter closer together which caused this footbridge to be so twisted. There is a suggestion that this be left as a memorial to the earthquake.
The clock face on the left is showing the correct time. The clock face on the right stopped at the moment of the big earthquake in CHCH on Sept 4th at 4.25am. It stayed like that for a week until fixed. Interestingly that face has not shown the correct time since.
The bridge on River Road just before the Banks Ave turn off. The bridge approach to the left subsided. Temporary repairs have been carried out but you can still see evidence of the amount of subsidence by the traffic island in the middle of the road.