Palmers Road, New Brighton
New Brighton water pumphouse
Corner Cresswell Ave, New Brighton Road
Water supply building, Palmers Road, New Brighton
20100905_3349_1D3-24 South New Brighton bridge mevement - Christchurch earthquake The South Brighton bridge abutment (city side). Bridge looks fine, just both approaches have moved A LOT! #380
None
Aftermath of September 4th Earthquake in Canterbury NZ. Bridge Street, South Brighton, Christchurch.
Aftermath of September 4th Earthquake in Canterbury NZ. Bridge Street, South Brighton, Christchurch.
Aftermath of September 4th Earthquake in Canterbury (area covers Christchurch City), NZ. Cracks alongside Avon river.
20100904_3322_1D3-200 Bridge Street bridge, Christchurch earthquake South Brighton Bridge. See the gap between the abutment and the bridge itself (just to right of lower person). #377
20100905_3347_1D3-32 Bridge Street split depth - Christchurch earthquake The city side of the South Brighton bridge. Approaches on both sides will need extensive work before this bridge can re-open. Bridge opened for traffic less than a week later, but still (23/09) has 30kmh speed restriction. #378
20100905_3346_1D3-24 Bridge Street cracking - Christchurch earthquake The city side of the South Brighton bridge. Approaches on both sides will need extensive work before this bridge can re-open. #379
A local resident walks to the nearest dairy for essentials after the 7.1 magnitude quake, that has caused major infrastructure damage to Christchurch City.
20100918_3507_1D3-47 Pumping Station - Christchurch earthquake The pumping station at the corner of New Brighton Road and Palmers Road. New Brighon Road is still closed (2 weeks after quake) at this point. #403