Search

found 21 results

Images, UC QuakeStudies

A photograph of the stairwell of the Diabetes Centre on Hagley Avenue. The hand rail on the right side has been removed from the wall and placed on the stairs while the walls are fixed and repainted. The gib has been removed from the facing wall.

Images, UC QuakeStudies

A photograph of the stairwell of the Diabetes Centre on Hagley Avenue. The hand rail on the left side has been removed from the wall and placed on the stairs while the walls are fixed and repainted. The gib has been removed from the facing wall.

Images, UC QuakeStudies

A photograph of a member of the Diabetes Centre team descending the stairs of the Diabetes Centre on Hagley Avenue. The hand rail to the left has been removed and placed on the stairs while the wall behind it is repainted.

Images, UC QuakeStudies

A photograph of members of the Diabetes Centre team standing on the stairwell of the Diabetes Centre on Hagley Avenue. The hand rail to the left has been removed and placed on the stairs while the wall behind it is repainted.

Videos, UC QuakeStudies

A video of a media tour inside the earthquake-damaged Hotel Grand Chancellor. The video includes footage of the eastern side of the ground floor of the hotel, the stairwells, some of the rooms, and the view through an opening in the side of the building. It also includes an interview with Jack Harris from Fletchers Construction about the work that is being done to support the structure.

Images, UC QuakeStudies

A photograph of the stairwell of the Diabetes Centre on Hagley Avenue. There is a workbench in the foreground and a plank of wood on the right side of the stairs. On the landing the wall has been repaired and is unpainted.

Images, UC QuakeStudies

A photograph of a sign in the window of the Diabetes Centre on Hagley Avenue. The sign reads, "The Diabetes Centre is open. There are currently some earthquake repairs going on inside the building; however the building is safe to enter. Unfortunately the lift is out of action. Here are some pictures of what the building looks like inside: the lift is out of action until further notice; the gib board in the stairwell is being replaced; some ceiling panels are being replaced; our friendly administration staff are happy to assist where possible".