A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
An infographic showing estimated repair costs for major Christchurch City Council facilities.
The flood bank is being completely repaired on Raven Quay in Kaiapoi.
The walls in the stairwell, repaired by injecting glue into the cracks.
Road cones line a hole in Gayhurst Road, dug for pipe repairs.
The information board for the Riccarton House earthquake repairs and strengthening project.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A photograph of the repaired Kaiapoi River footbridge, also known as Mandeville Bridge. This photograph was modelled off an image taken by a staff member from the Department of Civil and Natural Resources Engineering at the University of Canterbury in September 2010.
Photograph captioned by BeckerFraserPhotos, "Kaiapoi foot bridge".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Packing for EQC at 38 Belleview Terrace".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A chart giving costs for repair or rebuild of Christchurch City Council facilities.
Photograph captioned by BeckerFraserPhotos, "Dorset Apartments, Peterborough Street - closed for repairs".
Photograph captioned by BeckerFraserPhotos, "Running repairs on the huge hydraulic nibbler".
An aerial photograph looking east over the Arts Centre, where major repairs are underway.
A map showing infrastructure repairs to be carried out in Christchurch and surrounding areas.
One of the workers helping to repair the damage to the James Hight Library.
Photograph captioned by BeckerFraserPhotos, "Temporary repairs to damaged windows of Cranmer Court".
Photograph captioned by BeckerFraserPhotos, "Freemans Restaurant undergoing repairs in London Street, Lyttelton".