A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
A photograph captioned by Paul Corliss, "Fitzgerald Avenue reconstruction alongside Avon Loop".
Photograph captioned by BeckerFraserPhotos, "Large scale roadworks at the intersection of Avonside Drive, Woodham Road, and Linwood Avenue".
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A document which describes how the new Beachville Road seawall was built.
A pdf copy of a drawing for children focusing on diggers and road cones.
A pdf copy of a presentation which describes the stages of construction of the Beachville Road seawall.
A document which outlines the communication strategy behind the Lonely Cone campaign.
A media release which outlines the outcomes of the campaign to reclaim Christchurch cones.
A PowerPoint presentation which evaluates and analyses the effectiveness of The Lonely Cone Recall campaign.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members manage cyclists through road work sites safely.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members slow motorists through road work sites safely.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A promotional brochure explaining the Forward Works Viewer and that the tool was a key to cost-effective and efficient project delivery in Christchurch.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
A video about the discovery of a historic tramline on North Avon Road. The video includes an interview with Brent Leersynder, a site engineer for SCIRT, and Steve Timpson, site foreman for SCIRT. The SCIRT team found the tramline while repairing the damaged wastewater system under North Avon Road in May.
A photograph captioned by BeckerFraserPhotos, "A section of Avonside Drive shows how the infrastructure is no longer maintained to the same level, with regard to roading, sewage and water services. The houses behind show the crazy angles that the earth movement has left them at".
A photograph captioned by BeckerFraserPhotos, "A section of Avonside Drive shows how the infrastructure is no longer maintained to the same level, with regard to roading, sewage and water services. Even the grass on the banks of the River Avon is no longer mown as regularly".
A video of a presentation by Haydn Read, Programme Director of Smart City Coalition, at the 2016 Seismics in the City Conference. The presentation is titled, "Smart City/Choice City".The abstract for the presentation reads, "'We want to get to the point where people can get amazing information in real-time that helps them make choices about where to swim or what road to take' (Vicki Buck, Deputy Mayor of Christchurch). Real time information and feedback via the Internet of Things. The CCC is now part of Land Information New Zealand's (LINZ) Smart City coalition which aims to test the value of smart city concepts through a series of projects in Christchurch, Auckland, and Wellington."Note that due to technical issues, the final part of this presentation was not recorded.