Search

found 478 results

Articles, UC QuakeStudies

This study analysed liquefaction susceptibility and estimated ground settlements for two earthquake scenarios (foothills and Alpine Fault) for eastern Waimakariri District. The report was later partially superseded by Earthquake hazard assessment for Waimakariri District (Yetton and McCahon, 2009), which while not using such detailed analytical methods as the 2000 Beca report, reviewed new information available since 2000 (including that collected as part of the Pegasus Town development). This showed that the liquefaction susceptibility in eastern Waimakariri district was in fact much more variable than suggested in the 2000 Beca maps, and that liquefaction susceptibility was extremely difficult to predict without a site-specific investigation. See Object Overview for background and usage information.

Articles, UC QuakeStudies

A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.

Articles, UC QuakeStudies

This report provided information on the location and character of the Ostler Fault Zone near Twizel. The fault traces, and associated recommended fault avoidance zones, were mapped in detail for inclusion in a District Plan Change for the Twizel area. The Ostler Fault Zone was mapped in detail because of the higher likelihood of movement on that fault than others in the district, and the potential for future development across the fault zone because of its proximity to Twizel. See Object Overview for background and usage information. The report recommended that the information be incorporated into the District Plan Change and that site-specific investigations be undertaken before development is allowed within the fault avoidance zones. These recommendations were taken up by Mackenzie District Council.

Articles, UC QuakeStudies

A report created by the University of Canterbury Quake Centre and the University of Auckland, funded by the Building Research Levy. It shows how an innovation process was initiated and managed throughout the rebuilding of the horizontal infrastructure after the Canterbury earthquakes.

Articles, UC QuakeStudies

A plan which outlines how timely and accurate information relating to estimating, actual project costs, future commitments and total forecast cost will be managed and reported for each project phase in the programme. The first version of this plan was produced on 24 June 2011.