Search

found 740 results

Videos, UC QuakeStudies

A video of a tour of the Christchurch central city Red Zone. The video includes footage of Cambridge Terrace, the Copthorne Hotel on Colombo Street, Gloucester Street, the Government Life Building in Cathedral Square, the Grant Thornton Building in Cathedral Square, the ChristChurch Cathedral, the new Press Building on Gloucester Street, the Design and Arts College building on Worcester Street, the new Westende Jewellers Building, Hereford Street, the Westpac Trust Building, the BNZ Building, the Holiday Inn, Lichfield Street, High Street, and Cathedral Junction.

Images, UC QuakeStudies

A digital copy of a painting by Julia Holden. The painting is of the badly-damaged ChristChurch Cathedral, behind a temporary hoarding. The hoarding has been constructed on part of the footpath around Cathedral Square.

Images, UC QuakeStudies

A snapshot from GPS Boomerang's SmartBird flight over the Christchurch red zone on 23 December 2012, looking over Cathedral Square with the Christchurch Cathedral, the Post Office Building and the Chalice visible. The Holiday Inn has been demolished and the demolition of Clarendon Towers is almost complete.

Images, UC QuakeStudies

A photograph of people gathered in the Christchurch Transitional Cathedral, otherwise known as the Cardboard Cathedral. The audience is listening to Johnny McFarlane of Beca talking about project management of transitional architecture. The talk was part of a tour of the Cathedral, during FESTA 2013.

Videos, UC QuakeStudies

A video of a press conference about the ChristChurch Cathedral. The video includes statements by Jim Anderton and Stefano Pampanin, Associate Professor of Engineering at the University of Canterbury. Anderton and Pampanin discuss a report produced by the Great Christchurch Buildings Trust (GCBT) which outlines how the cathedral could be safely restored. The Anglican Church has agreed to review the report.

Videos, UC QuakeStudies

A video of a public forum being held to discuss the Anglican Church's three options for the restoration of the ChristChurch Cathedral. The three options are restoring the original cathedral, reinterpreting the original cathedral in modern materials, or building a contemporary cathedral. The video includes footage of speeches by Bishop Victoria Matthews and RCP project manager Marcus Read. It also includes footage of Matthews, Read, and Warren and Mahoney architect Bill Gregory answering questions from the public.

Videos, UC QuakeStudies

A video of the Rally for the Cathedral in Cranmer Square. The video includes footage of Jim Anderton, Mark Belton, Helen Broughton, and former Mayor Garry Moore speaking to the crowd. It also includes footage of people marching down Worcester Street. The Rally for the Cathedral was held on 26 May 2012 to protest the demolition of the ChristChurch Cathedral.