Construction workers remove stones from the damaged Arts Centre.
Construction workers working on the Loons Circus Theatre Company building on Canterbury Street in Lyttelton.
A photograph of construction workers and members of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Durham Street.
Construction workers working on the Loons Circus Theatre Company building on Canterbury Street in Lyttelton.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Colombo Street. In the distance, a group of construction workers are walking down the street.
Construction workers' vehicles on High Street. In the background, high-reach excavators demolish a building.
A photograph captioned by BeckerFraserPhotos, "Workers laying a new footpath outside 540 Colombo Street".
A photograph captioned by BeckerFraserPhotos, "A de-construction worker on the MFL House site".
The top story of Fuze Restaurant and Cafe is dismantled by construction workers. The building formerly housed the Harbour Board offices, and was built in 1880.
Two construction workers on Kilmore Street with hard hats and high-visibility jackets. A large pipe is running beside them.
Construction workers with high visibility clothing and hard hats assemble a crane on High Street to help demolish the Westpac Building.
Construction workers working on the demolition of the Convention Centre take a break outside a shipping container facility on Kilmore Street.
Construction workers examining the damaged top of the facade of the Lyttelton Coffee Company building on London Street in the basket from a crane. In the foreground, a pile of scrapped corrugated iron can be seen.
Construction workers examining the damaged top of the facade of the Lyttelton Coffee Company building on London Street in the basket from a crane. In the foreground, a pile of scrapped corrugated iron can be seen.
Construction workers with high visibility clothing and hard hats assemble a crane on High Street to help demolish the Westpac Building. The BNZ building can be seen in the background.
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
Piles of rubble along Kilmore Street. A digger can be seen in the background as well as a construction worker in a hard hat and high-visibility vest. The rubble has been separated into different piles.
A photograph looking east down Gloucester Street from near the Manchester Street intersection. Members of the Wellington Emergency Management Office Emergency Response Team and construction workers are walking down the street. To their right is the new Press House building with many broken windows. In the foreground, the Coachman building has sustained earthquake damage to the façade. Wire fences have been placed around the building as a cordon.