A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
A photograph of a model of the ChristChurch Cathedral built from LEGO by Sam Butcher, finished in September 2011.
Photograph captioned by BeckerFraserPhotos, "The northern aspect of the Cathedral hidden behind the container wall and the cafe".
An aerial photograph captioned by BeckerFraserPhotos, "Worcester Street from Latimer Square to the Christ Church Cathedral".
A photograph captioned by BeckerFraserPhotos, "The Christ Church Cathedral looks uncharacteristically unkempt".
A photograph of the north side of the ChristChurch Cathedral with the Citizen's Memorial to the left. The roof of the cathedral has been damaged, and many of the doors and windows boarded up. On the memorial, the angel's waist and neck have been braced to keep her standing.
A digital copy of a painting by Julia Holden. The painting is of road cones on Colombo Street. In the background is the badly-damaged ChristChurch Cathedral.
A photograph looking south down Colombo Street towards the badly-damaged ChristChurch Cathedral. Buildings have been fenced off on both sides and there are fallen bricks and rubble on the footpaths.
A photograph of the earthquake-damaged tower of the ChristChurch Cathedral. A crane and a large pile of rubble are sitting in front of the tower.
A photograph of Worcester Street looking west from a cordon on Manchester Street towards the back of ChristChurch Cathedral. Cordon fencing has been placed along both sides of the street.
A photograph of Worcester Street looking west from a cordon on Manchester Street towards the back of ChristChurch Cathedral. Cordon fencing has been placed along both sides of the street.
A digital copy of a painting by Julia Holden. The painting is of road cones on Colombo Street. In the background is the badly-damaged ChristChurch Cathedral.
Photograph captioned by BeckerFraserPhotos, "The Christ Church Cathedral showing the new damage inflicted by the 13 June 2011 aftershock".
An aerial photograph of the Christchurch central city with Armagh Street in the foreground and Christ Church Cathedral in the centre.
A photograph of a detail of the front of Christ Church Cathedral. The upper part of the front wall has crumbled leaving the inside space exposed. Steel bracing has been placed against the wall to limit further damage.
A photograph looking south down Colombo Street towards the earthquake-damaged ChristChurch Cathedral. A crane is sitting on the road in front of the Cathedral. In the background is a pile of rubble from the partially-demolished tower.
A close up of Christ Church Cathedral's stonework and slate-tiled roof.
A timeline of the debate surrounding the demolition of ChristChurch Cathedral.
An infographic showing a proposal for the restoration of Christ Church Cathedral.
The boarded up windows on the north side of Christ Church Cathedral.
Image of containers on the roadside next to the ChristChurch Cathedral.
An infographic showing differing views on the future of ChristChurch Cathedral.
Christ Church Cathedral, Christchurch, with spire being rebuilt after the 1901 earthquake. Photographer unidentified.
The nave, tower and spire of Christchurch Cathedral was completed in 1881. Work on completeing the rest of the building began in 1900. In 1902 the transcepts were finished and work started on the chancel and apse. An earthquake in 1901 cracked the upper part of the spire in two places. In this photograph which dates from late 1902/1903 (see scaffolding beyond the transcept indicating work on chancel) the upper part of the spire has been removed by Messrs Graham and Greig in preparation for replacing this section with a copper covered wooden structure. The Cathedral was completed in 1904. (Information from "Vision and Reality; Christchurch Cathedral in the Square," Colin Brown, Christchurch, 2000 and "A Dream of Spires," Ian Lochhead, Canterbury University Press, 1999, page 153.) Preparation for erecting the scaffolding was reported in the Christchurch Star 15 January 1902. The cross was replaced on the top of the new copper covered wooden section of the spire on 29 June 1903.
Source of descriptive information - Notes on file print. Source of title - Title supplied by Library
Quantity: 1 b&w original negative(s).
Physical Description: Glass negative